" " " "
HTME

COURSE OVERVIEW

DE0900 : Completion Design Practices and Perforation

Completion Design Practices and Perforation
OVERVIEW
COURSE TITLE : DE0900 : Completion Design Practices and Perforation
COURSE DATE : Nov 02 - Nov 06 2026
DURATION : 5 Days
INSTRUCTOR : Mr. Fred Lazor
VENUE : London, United Kingdom
COURSE FEE : $ 8800
Register For Course

Course Description

 
This practical and highly-interactive course includes real-life case studies where participants will be engaged in a series of interactive small groups and class workshops. 
 
This course is designed to provide participants with a detailed and up-to-date overview of completion design practices and perforation. It covers the basic well completion design, practices and strategies; developing a high level completion strategy for wells in a variety of situations; the packer selection and tubing forces; the selection of tubing, packers and completion flow control equipment; the wellheads/chokes/subsurface safety valves and flow control equipment; and the appraisal/designing a suitable flow barrier strategy and suitable intervention strategy. 
 
Further, this course will also discuss the recommendations on installation and retrieval practices for tubing, packers, etc. in different well types; the corrosion and erosion inflow and tubing performance; the tubing design, packer setting, retrieval and material selection; the key design features for horizontal, multilateral, HPHT wells, etc; the deviated/multiple zone/ subsea/horizontal/multilateral and HPHT completion considerations; the selection of an appropriate intervention strategy/equipment; and the key features/applicability of the main sand control, fracpack and well stimulation options. 
 
During this interactive course, participants will learn the fluids chemicals and acidizing techniques, sandstone acidizing and carbonates acidizing; the well candidates for stimulation; the perforation process, factors affecting charge performance and perforating techniques; the types of guns, perforating damage pressure, control equipment and safe rig up; how to assess/specify concerns/remedial measures for formation damage/skin; the wireline/coiled tubing/snubbing operations; developing and outline overall strategy for a completion program; and the HSE related issues. 

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Practical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

OTHER SCHEDULED DATES
Refrence Date Location Instructor Fee (USD) Outline Actions
DE0900 Apr 26 - Apr 30 2026 (5 Days) Doha, Qatar Mr. Fred Lazor $ 8,500 Outline
DE0900 Jun 21 - Jun 15 2026 (-5 Days) Dubai, UAE Mr. Fred Lazor $ 8,000 N/A
DE0900 Aug 30 - Sep 03 2026 (5 Days) Istanbul, Turkey Mr. Fred Lazor $ 8,500 N/A
DE0900 Oct 04 - Oct 08 2026 (5 Days) Doha, Qatar Mr. Fred Lazor $ 8,500 Outline
DE0900 Dec 27 - Dec 31 2026 (5 Days) Seville, Spain Mr. Fred Lazor $ 8,800 N/A
DE0900 Jan 31 - Feb 04 2027 (5 Days) Cairo, Egypt Mr. Fred Lazor $ 8,000 N/A

RELATED COURSES

Petroleum Project Economics & Risk Analysis

DE0923 : Petroleum Project Economics & Risk Analysis

Well Composite, Construction Integrity & Completion

DE0960 : Well Composite, Construction Integrity & Completion

Integration of Core & Log Data

DE0009(KP4) : Integration of Core & Log Data

Trouble-Free Drilling (Stuck Pipe Prevention)

DE0970 : Trouble-Free Drilling (Stuck Pipe Prevention)