" " " "
HTME

COURSE OVERVIEW

DE0251(AD6) : Production Operations in the Oil & Gas Fields & Surface Facilities: Operation of Process Equipment, Separation of Oil/Gas/Water, Controlling Flow/Pressure/Temperature, Injection of Water/Gas & Process Troubleshooting

Production Operations in the Oil & Gas Fields & Surface Facilities: Operation of Process Equipment, Separation of Oil/Gas/Water, Controlling Flow/Pressure/Temperature, Injection of Water/Gas & Process Troubleshooting
OVERVIEW
COURSE TITLE : DE0251(AD6) : Production Operations in the Oil & Gas Fields & Surface Facilities: Operation of Process Equipment, Separation of Oil/Gas/Water, Controlling Flow/Pressure/Temperature, Injection of Water/Gas & Process Troubleshooting
COURSE DATE : May 25 - May 29 2026
DURATION : 5 Days
INSTRUCTOR : Mr. Konstantin Zorbalas
VENUE : London, United Kingdom
COURSE FEE : $ 8800
Register For Course

Course Description

 
This practical and highly-interactive course includes various practical sessions and exercises. Theory learnt will be applied using our state-of-the-art simulators. 
 
This course is designed to provide participants with an up-to-date overview of the production operations in the oil and gas fields and surface facilities covering the operation of process equipment, separation of oil/gas/water, controlling flow/pressure/temperature, injection of water/gas and process troubleshooting. It aims to establish an understanding of the processes, technology, equipment, techniques and HSE associated with oil and gas production and operation. 
 
The course covers the different eras of petroleum industry; the similarities and differences of upstream and downstream O&G; the function, operation and equipment of the wellhead tower; the purpose, equipment and uses of production manifold; the well construction; the vertical, deviated and horizontal wells; the well completion consisting of casing design, fracturing, perforating, acid stimulation, sand control, coiled tubing operations and logging; and the processes involved in the separation of oil, gas and water. 
 
During this interactive course, participants will learn the oil and gas production streams, their flows and pressure; the methods of controlling flow, pressure and temperature; the flow assurance covering paraffin, wax, scale, asphaltenes, corrosion and erosion; the types and purpose of production equipment including the need, operations and equipment of artificial lift; the electrical submersible pumps, gas lift and progressive cavity pumps for heavy oil; the water and gas injection technology; and the proper waterflooding and troubleshooting. 

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Practical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

OTHER SCHEDULED DATES
Refrence Date Location Instructor Fee (USD) Outline Actions
DE0251(AD6) Apr 13 - Apr 17 2026 (5 Days) Seville, Spain Mr. Konstantin Zorbalas $ 8,800 N/A
DE0251(AD6) Apr 26 - Apr 30 2026 (5 Days) Doha, Qatar Mr. Konstantin Zorbalas $ 8,500 Outline
DE0251(AD6) Jul 19 - Jul 23 2026 (5 Days) Istanbul, Turkey Mr. Konstantin Zorbalas $ 8,500 N/A
DE0251(AD6) Aug 16 - Aug 20 2026 (5 Days) Cairo, Egypt Mr. Konstantin Zorbalas $ 8,000 N/A
DE0251(AD6) Oct 18 - Oct 22 2026 (5 Days) Doha, Qatar Mr. Konstantin Zorbalas $ 8,500 Outline
DE0251(AD6) Dec 06 - Dec 10 2026 (5 Days) Dubai, UAE Mr. Konstantin Zorbalas $ 8,000 N/A
DE0251(AD6) Jan 10 - Jan 15 2027 (6 Days) Seville, Spain Mr. Konstantin Zorbalas $ 8,800 N/A
DE0251(AD6) Mar 28 - Apr 01 2027 (5 Days) Cairo, Egypt Mr. Konstantin Zorbalas $ 8,000 N/A

RELATED COURSES

Trouble-Free Drilling (Stuck Pipe Prevention)

DE0970 : Trouble-Free Drilling (Stuck Pipe Prevention)

Petroleum Project Economics & Risk Analysis

DE0923 : Petroleum Project Economics & Risk Analysis

Well Composite, Construction Integrity & Completion

DE0960 : Well Composite, Construction Integrity & Completion

Integration of Core & Log Data

DE0009(KP4) : Integration of Core & Log Data