" " " "
HTME

COURSE OVERVIEW

DE1084 : Drilling Engineer: Drilling Efficiency, Problem Solving & Optimization Techniques

Drilling Engineer: Drilling Efficiency, Problem Solving & Optimization Techniques
OVERVIEW
COURSE TITLE : DE1084 : Drilling Engineer: Drilling Efficiency, Problem Solving & Optimization Techniques
COURSE DATE : Nov 23 - Nov 27 2026
DURATION : 5 Days
INSTRUCTOR : Dr. Chris Kapetan
VENUE : London, United Kingdom
COURSE FEE : $ 8800
Register For Course

Course Description

 This practical and highly-interactive workshop includes various practical sessions and exercises. Theory learnt will be applied using our state-of-the-art simulators.
This course is designed to provide participants with a detailed and up-to-date overview of Drilling Engineer: Drilling Efficiency, Problem Solving and Optimization Techniques. It covers the drilling efficiency, well planning and design for efficiency, drill bit selection and hydraulics; the drill string and bottom hole assembly (BHA) design, mud systems and hole cleaning and rig selection and equipment capabilities; the real-time data acquisition, drilling performance metrics and visualization and analytics tools; the downhole dynamics and vibration analysis, drilling hydraulics monitoring; and the drill bit tracking and optimization. Further, the course will also discuss the structured problem-solving techniques, stuck pipe and hole problems and well control and kick management; the wellbore stability challenges, torque and drag optimization and cementing and well integrity issues; and the automated drilling systems, predictive analytics and machine learning and pressure management strategies. 

 During this interactive course, participants will learn the rig power consumption monitoring, fuel optimization and emissions reduction, water usage and cuttings disposal and regulatory compliance and reporting; the rotary steerable systems versus mud motors, real-time downhole tool adjustments, high-temperature, high-pressure tool selection and novel drilling fluids; the value stream mapping of drilling operations, eliminating non-value-added activities, standard operating procedures and checklists and continuous improvement culture; the risk management and safety integration; and the implementation roadmap and change management. 

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Practical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

OTHER SCHEDULED DATES
Refrence Date Location Instructor Fee (USD) Outline Actions
DE1084 May 31 - Jun 04 2026 (5 Days) Istanbul, Turkey Dr. Chris Kapetan $ 8,500 N/A
DE1084 Jul 20 - Jul 24 2026 (5 Days) Cairo, Egypt Dr. Chris Kapetan $ 8,000 N/A
DE1084 Aug 17 - Aug 21 2026 (5 Days) Doha, Qatar Dr. Chris Kapetan $ 8,500 N/A
DE1084 Oct 18 - Oct 22 2026 (5 Days) Dubai, UAE Dr. Chris Kapetan $ 8,000 N/A
DE1084 Dec 14 - Dec 18 2026 (5 Days) Seville, Spain Dr. Chris Kapetan $ 8,800 N/A
DE1084 Jan 03 - Jan 07 2027 (5 Days) Cairo, Egypt Dr. Chris Kapetan $ 8,000 N/A
DE1084 Feb 07 - Feb 11 2027 (5 Days) Dubai, UAE Dr. Chris Kapetan $ 8,000 N/A
DE1084 Mar 21 - Mar 25 2027 (5 Days) London, United Kingdom Dr. Chris Kapetan $ 8,800 N/A

RELATED COURSES

Trouble-Free Drilling (Stuck Pipe Prevention)

DE0970 : Trouble-Free Drilling (Stuck Pipe Prevention)

Petroleum Project Economics & Risk Analysis

DE0923 : Petroleum Project Economics & Risk Analysis

Integration of Core & Log Data

DE0009(KP4) : Integration of Core & Log Data

Well Composite, Construction Integrity & Completion

DE0960 : Well Composite, Construction Integrity & Completion